Sub-boards & connected workflows

Break big steps into their own plans

“Build the app” isn’t a step. It’s a project of its own. In Flowboard, any step can have its own board, and the step’s card shows how far along that board is.

Big projects hide smaller projects inside them

Cram every sub-task into one plan and it becomes unreadable. Split them into separate documents or tools and you lose track of how they connect. What you need is both: a simple top-level plan, and a detailed plan behind each big step.

How it works in Flowboard

  1. 1

    Give a step its own board

    Open a step and create a sub-board, or use a workflow card, which gets its own board the first time you open it.

  2. 2

    Plan the detail there

    The sub-board is a full board with its own columns, steps, gates and documents. Sub-boards can have sub-boards too.

  3. 3

    Watch progress roll up

    The parent card shows a strip with the sub-board’s name and “3 of 7 steps done”, kept up to date automatically, plus a checklist of its steps you can tick from the parent.

  4. 4

    Finish with confidence

    Marking the parent step done while its sub-board still has open steps asks you first, so nothing slips through.

When to use it

  • A step takes more than a week or involves several people
  • You want an executive view and a working view of the same project
  • Phases of a project have their own milestones
  • You’re running several related projects under one goal

Common questions

How deep can sub-boards go?
As deep as you need. A sub-board’s steps can have sub-boards of their own, and each level shows its progress on the card above it.
Can I copy a board with all of its sub-boards?
Yes. Duplicating a board copies everything on it, plus every sub-board it links to, with all links pointing inside the copy.